Version 10.0.41.20240927 | Major Release | September 27, 2024
Work item type Title VSTS ID Version
Enhancement Ability of having more than one role assigned for the same resource in the Fee Estimator 92281 10.0.41.20240927
Enhancement Add WBS ability of calculating cost amount and sales amount based on all the different prices for a range of time 89671 10.0.41.20240927
Enhancement Additional configuration to copy Fee estimate versions 81686 10.0.41.20240927
Enhancement Refactor existing WBS Planner and Fee estimator templates 92944 10.0.41.20240927
Enhancement Need to have the feasibility to add multiple filter criteria on the Editable Grid control 92439 10.0.41.20240927
Enhancement Direct booking is taking a long time to hard book the bookable resources 92095 10.0.41.20240927
Enhancement Extend the copy from fee estimate code to consider custom fields 92850 10.0.41.20240927
Enhancement After the opportunity is copied from the parent opportunity then Contract of parent opportunity should not get flown to copied Opportunity 93064 10.0.41.20240927
Enhancement In the copied opportunity, the data displayed for the copied opportunity lines is incorrect 93065 10.0.41.20240927
Enhancement The syncing of the effective date for regular role prices from PO to FO should be enhanced. 93143 10.0.41.20240927
Enhancement Created new parameter that configure how many estimates are created/updated in 1 operation 93145 10.0.41.20240927
Issue The Remaining Planned Cost in the ETC/EAC Management tab should automatically populate with the value from the Remaining Cost in the Effort Allocation spreadsheet 92277 10.0.41.20240927
Issue In WBS planner, if a cell was locked down after updating a value and the user refresh the record/browser the lock down disappears 92332 10.0.41.20240927
Issue After the project has been released and published, I noticed that the project task status automatically reverts to “Draft” without any changes being made to the WBS task level structure 92459 10.0.41.20240927
Issue The “Promote Subtasks” functionality is not working properly in Projects 91498 10.0.41.20240927
Issue The Updated EAC Multiplier and EAC multiplier calculation are not being calculated correctly in the Effort Allocation spreadsheet 92354 10.0.41.20240927
Issue Getting error “Unable to specify a percent when using at cost price calculation” when user is trying to create a new markup-based role price 92835 10.0.41.20240927
Issue Copy Opportunity is not working 92981 10.0.41.20240927
Issue Bookable resource sync scenario from FO to PO 90958 10.0.41.20240927
Issue Advanced copy functionality missing 92489 10.0.41.20240927
Issue Original Contract Hours doesn’t update Total Contract Hours for zero value 93043 10.0.41.20240927
Issue Default Estimate version is not defaulting in Fee estimator spreadsheet 92344 10.0.41.20240927
Issue Role price overrides are not being synced to the contract-specific price list when the role price override is created from FO to PO 93173 10.0.41.20240927

Version Information

Package Name Model Name Version
projects360 for Project Operations ProjOperations 10.0.41.20240927