This new feature provides the ability to move specific Task dates or All Task Dates forward or backward in time.

  • The feature is available from WBS Planner, Fee Estimator and Effort Allocation xl360 spreadsheets.
  • In WBS Planner and Effort Allocation when this process is executed both the task dates as well as the allocated effort assigned to resources will be moved accordingly.

Move Task Dates/Move All Task Dates

Hover to the Task or Subtask and then double click on the Task/subtask, a new dialog box will appear where user will be able to see two different sections like Dates and Move section.

Date Section will comprise of two different fields primarily as:

Fields Description
Start Date Users can choose a date in the WBS Planner, Effort Allocation, or Fee Estimator spreadsheet. This date will automatically become the default Start Date in all “Move Task Dates” Dialog Box. You can adjust this Start Date later, moving it forward or backward as needed.
New Start Date Users can pick any date they like in this box.
  • If the New Start Date is before the Start Date:
    • The “Direction” field in the “Move” section of the “Move Task Dates” dialog box will be set to “Backward” and locked.
    • The “Move Dates by” field will default to “Day” and remain locked.
    • The “Length of Periods” difference between the Start Date and New Start Date will be calculated based on the number of days, including Saturdays and Sundays.
  • If the New Start Date is after the Start Date:
    • The “Direction” field will be set to “Forward” and locked.
    • The “Move Dates by” field will default to “Day” and remain locked.
    • The “Length of Periods” difference between the Start Date and New Start Date will be calculated based on the number of days, including Saturdays and Sundays.

When New Start Date is before the Start Date of Task

When New Start Date is after the Start Date of Task

Move Section will comprise of three different fields primarily as:

Fields Description
Direction
  • The field will be locked if there’s a date in the New Start Date field. It will show either “Forward” or “Backward,” as we explained earlier in the Dates section.
  • The field will be unlocked if the user doesn’t enter any date in the New Start Date field. This gives users the flexibility to manually choose the Direction as either “Forward” or “Backward”.
Move Dates By
  • The field will be locked if there’s a date in the New Start Date field. It will also be set to “Day” and locked, as we explained earlier in the Dates section.
  • The field will be unlocked if the user doesn’t enter any date in the New Start Date field. This gives users the flexibility to move dates by “Day,” “Week,” “Month,” or “Year”.
Length of Periods
  • This field will be locked if there’s a date in the New Start Date field. It will be set based on the time frame of days between the Start Date and the New Start Date, as we already explained in the Dates section.
  • The field will be unlocked if users do not provide any date in the New Start Date field. This allows users to provide the length of the period depending on the selection made in the “Move Dates By” field.

Direction field in “Move” section.

Move Dates By field in “Move” section.

Length of Periods field in “Move” section.

Note – Depending on the direction of the move, the selected frequency (daily, weekly, monthly, or yearly), and the length of the periods set in the “Move Task Dates” dialog box, the tasks in the spreadsheet will move backward or forward accordingly.

The same can be understood with help of one example:
If Task “Design phase has” start date as “1st January 2024 and “End Date” as “31st January 2024” and system will automatically calculate “Duration” which is non editable field and showing as “23”.

  • If the Direction is set as “Forward,” the “Move dates by” field is set as “Week,” and the Length of Period is set as “2,” then the Task Start Date of the “Design phase” task will move forward by 2 weeks. The New Start date of the Task will become “January 15th, 2024,” and based on the Duration set for the task, the End Date of the Task will automatically get updated.

  • If the Direction is set as “Backward,” the “Move dates by” field is set as “Month,” and the Length of Period is set as “4,” then the Task Start Date of the “Design phase” task will move backward by 4 months. The New Start date of the Task will become “September 1st, 2023,” and based on the Duration set for the task, the End Date of the Task will automatically get updated.